| 01/15/2025 | P-24-027080 - Adding 2nd Source. To ensure component availability, there will be an 2nd source of sub-assembling made from an external supplier in China. These sub-assembling are related with manufacturing parts before winding process. There is no change in resolver manufacturing process, product form, fit and any technical functions of the products. Please don't hesitate to contact your TE representative in case of any questions. | Download |
| 06/01/2021 | P-21-020544 - Product improvement. In order to ensure component availability, there will be a second source of equivalent high temperature cables implemented in addition to the existing supplier. There is no change in resolver manufacturing process, product form, fit, technical function. Please don't hesitate to contact your TE representative in case of any questions.
| Download |
| 06/01/2021 | P-21-020546 - Product improvement. This product change notification is related to all TE resolvers size 15 that have NiFe material as part of the stator and rotor transformer. In order to ensure component availability, there will be a second source of equivalent NiFe raw material implemented in addition to the existing material. There is no change in resolver manufacturing process, product form, fit, technical function. Please don't hesitate to contact your TE representative in case of any questions. | Download |
| 10/12/2020 | P-20-019442 - Space optimization. Relocation of the product manufacturing line in another building at our TE facility in Evora, Portugal. No change to the products, manufacturing processes, equipment or product form, technical functions or any drawings. The related employees and workers will transfer to the new building at the same time. The manufacturing transfer is planned for CW 38/2020 to CW40/2020 time frame
| Download |