| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | TE Connectivity |
| Manufacturer Part Number: | TE Connectivity 1544133-1 |
| Amperage: | 46 A |
| Termination Method: | Crimp |
| Operating Temperature Range: | -40 - 125 °C, -40 - 125 °F |
| Wire Size: | 10 - 14 AWG, 2.5 - 6 mm² |
| Crimp Type: | F-Crimp |
| Terminal Primary Locking Feature: | Clean Body |
| Terminal / Splice Type: | Receptacle |
| Product: | Automotive, Truck, Bus, & Off-Road Terminals |
| SKU: | AMP1544133-1 |
1544133-1
Specifications
Detailed Description
Enhance your automotive connectivity with our durable CLIP 6.35 NG1 terminal, designed for efficient power transmission in a variety of vehicles. With a high amperage rating of 46 A, it ensures reliable performance under demanding conditions. The F-Crimp termination method guarantees secure and lasting connections, while the Clean Body design with terminal primary locking feature offers added convenience during installation. Operating flawlessly in temperatures ranging from -40 to 125 °C (-40 to 125 °F), this terminal accommodates wire sizes of 2.5 to 6 mm² (10 to 14 AWG) with ease. Its receptacle splice type further enhances versatility, making it a must-have for automotive, truck, bus, and off-road applications. Rest assured of its compliance with RoHS standards, reflecting our commitment to quality and sustainability. Elevate your wiring projects with this essential automotive connector.
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 04/18/2025 | P-25-027618 - Manufacturing Location Change. This Product Change Notification (PCN) is to inform about tool Transfer for listed PNs, from TE Tangier TAC1 to TE Tangier TAC2 according to VDA Trigger Matrix No. 29 and AIAG section 3.1, item 4. The change has no impact to form-fit-function. TE Change process follows a strict procedure, which fully maintains quality and ability to supply. Internal release process is ensured by TE, including product validation as per OEM/CAM requirements. Validation will be initiated and completed according to project plan, as soon as samples are available. | Download | |||

