| Attribute | Value |
|---|---|
| Product Category: | |
| Manufacturer: | ERNI |
| Manufacturer Part Number: | ERNI 374722-E |
| Series: | MicroSpeed |
| Part Aliases: | 374722-E |
| SKU: | ERN374722 |
374722-E
Specifications
Product Change Notice
| Effective Date | Description of Change | Download | |||
|---|---|---|---|---|---|
| 08/18/2025 | PCN-25-251909 - Manufacturing location change.we hereby inform you about transitioning the plating of MicroSpeed to alternative suppliers, additional plating lines at existing suppliers and insourcing into our internal plating facility. This change aims to enhance the reliability and flexibility of our supply chain. These plating vendors has been confirmed technical feasibility via sample trials or series production releases of similar products. These plating vendors will perform the standard control and quality measures on individual production batches, which are obligatory to comply with our internal series production and product specifications. These measures will include: - Thickness measurements - Optical and adhesion tests Minor optical differences may be possible due to different tooling. All other process steps during the manufacturing of our products will remain according to our existing releases. The alternative plating supply chain does not change the fit, form, or function of the product but implies a manufacturing location change. | Download | |||
| 06/14/2024 | DE-23-011-0720 - Design Change.to optimize our manufacturing process we implement a slight design change in the shield of our MicroSpeed angled connectors. A detailed description of the change you can find in the pictures below. These change will be operated without partnumber change. This change will not affect reliability of product and has no impact on fit or function of these products. | Download | |||
| 01/01/2024 | De-23-05-0685 -Expand Supply Chain. we will expand the supply chain of the plated contacts by insourcing this manufacturing process into our new inhouse plating facility in Adelberg in addition to our current plating suppliers. The internal serial production shall start in January 2024. The insourcing will be operated without part number change, will increase reliability of supply chain, and has no impact on form, fit or function of these products. Internal product and process approval process will be performed. | Download | |||

