Effective Date | Description of Change | Download |
07/01/2022 | PCN-22-144528 - Shipment date changes. Due to COVID-19 pandemic, the estimated shipping dates for the changed products are updated for PCN E-20-006535 which was already distributed. updated the estimated date of first shipment and mixed shipment for the changed parts from previous notification per PCN E-20-006535. Before: First Date To Ship was 01-SEP-2020 & Last Date for Mixed Shipments was 01-MAY-2021. After: First Date To Ship is 02-JUL-2022 & Last Date for Mixed Shipments is 30-JUN-2023. | Download |
10/01/2021 | PCN-21-100939 - Packaging Change. PACKAGING CHANGE TO PDL 3.96MM PITCH 2P&3P DOUBLE LOCK PLATE. | Download |
09/01/2020 | E-20-006535 - Product Improvement. Adding a second material to accommodate the market constraints. There are no performance changes. | Download |
06/05/2020 | E-19-008751-C - PCN Retraction. TE decided to continue supplying listed PNs with current resin and stop the alternative resin addition to current products. | Download |
12/03/2019 | E-19-008751 - Product Improvement. Adding a second resin to accommodate market constraints.
| Download |