Effective Date |
Description of Change
| Download |
10/15/2021 |
510489 - Change Supplier. resin manufacture had claimed Force Majeure to molex at the end of May. no guarantee of recovery time frames from their shanghai plant but their Nansha plant can support the same grade of material in order to support continually molex decided to accept the vendors proposal current material source: Shanghai China New Material Source: Nansha China |
Download |
03/19/2018 |
505378 - Retraction. This notification is to advise you of a modification to a previously issued PCN. |
Download |
03/01/2018 |
503293 - Capacity change or tool replacement. This letter is to inform you that another set of tooling is being added to meet the current and future demands of this product. There will be no changes in the fit, form or function from the additional tooling when compared to the current tooling. |
Download |
06/10/2017 |
502589 - Capacity change or tool replacement. This letter is to inform you that another set of tooling is being added to meet the current and future demands of this product. There will be no changes in the fit, form or function from the additional tooling when compared to the current tooling. |
Download |
01/20/2017 |
501132 - Capacity change or tool replacement. This letter is to inform you that another set of tooling is being added to meet the current and future demands of this product. There will be no changes in the fit, form or function from the additional tooling when compared to the current tooling. |
Download |
06/11/2015 |
GCM 10683717 - Upgrade / Rearrangement Of Tooling / Equipment. |
Download |
10/01/2012 |
GCM 10549192 - Production location change. Current location is local vendor at Japan. This would change to Chengdu plant. |
Download |